How to make a Stormwater Management Plan
Goal: To direct runoff to main road (and specify in the plan how will this be accomplished on site)
It is recommended for pads to be packed at a slightly higher grade than the road (but at even grade with adjacent properties when sensible) and on a diagonal, slope the lot gradually to be at an even grade with the main road.
Some examples of stormwater management infrastructure include the following:
Building Infrastructure
- Gutters
- Snow dams/avalanche guards
- Eavestrough
Ground Infrastructure
- Ditching
- Drain Tiles
- Culverts
- French Drains
- Drainage Swale
Note: Snow dams are required on all new builds
