Canadian Bank of Commerce NHS : Stabilization
You might have seen some activity around the Canadian Bank of Commerce NHS in spring of 2019.
In advance of the 2019 work a temporary mesh cover was placed over the east and south facades to deter the nesting of swallows. Thanks to Wildstone Construction and Engineering who assisted the City of Dawson to install the mesh cover. A special thanks to Mike Loiseau, Wildstone Site Superintendent at the Water Treatment Plant and Josh Wittmeier, Wildstone Lift Operator, for their expertise and generosity.
Technical Arts and Services of Tagish, YT was awarded the contract to provide a complete set of extant record drawings to document existing dimensions, materials, and conditions to guide future restoration work.
Williams Construction of Dawson City, YT was awarded the contract to remove the stair on the west elevation (riverside) and complete the framing to restore the building openings to the pattern during the period of commemoration. This is the first step in returning the exterior of the building to its original design.
Ultimate Construction Inc. of Barrie, ON was awarded the contract to restore the exterior pressed tin on all four sides of the building. This is specialized and exciting work. See their link for more on this contractor www.ultimateconstruction.ca/services/heritage-restoration/. This work was the last work scheduled for this year.
Planning for 2020 currently in progress and may include exterior pressed tin restoration and painting.